Floor Leveling – Hudson Gardens

Floor Leveling – Hudson Gardens

This project required floor leveling before a finished floor could be installed. The slab was in rough shape, which would have left the floor installed on top of it uneven. We ground the floor with large walk behind concrete grinders. Afterwards, we installed a primer...