3,200 sq. ft. of metallic epoxy in an office space with an attached warehouse. The owner wanted a floor that would highlight the brick, so we chose a gray metallic epoxy over a dark brown background to bring through some of the natural brick tones in places....
This project for an academic building in Boulder involved grinding off a 1/4-3/8″ thick cementitious underlayment and the original failed coating beneath it. Next, we reinstalled an Ardex MC Rapid moisture mitigation system and reinstalled an Ardex cementitious...